Elevated installation - Tucson Local Media: Pima Pinal

Elevated installation

Print
Font Size:
Default font size
Larger font size

Posted: Tuesday, September 21, 2010 11:00 pm

Dario Millan, in the yellow helmet, and Uriel Garcia align their lift basket as Aaron Leyva, left, sets up the artwork to be attached to the Twin Peaks interchange bridge above Interstate 10 last week. Construction on the Twin Peaks project as well as the new Camino de Mañana is on schedule, with expected completion in November and ribbon cuttings set for Nov. 19.

© 2016 Tucson Local Media. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

More about

More about

More about

Welcome to the discussion.

PGA Tour Superstore Grand Opening

More Featured Videos

Featured Videos

Spacer4px

Online poll

What do you think should happen with Som and Krystin Lisaius' child?

Som and Krystin Lisaius, two members of Tucson’s local media scene, have found themselves in a deeply troubling situation after taking their 4-month-old daughter to a local hospital, where cocaine was found the child’s system.

Total Votes: 116

Loading…
Loading…

Follow us on Facebook