Rancho Vistoso, Oro Valley

Work has begun on upgrade of the median in Rancho Vistoso, according to a release from the Town of Oro Valley.

Work begins at the west end of Sun City Vistoso, heading south between East Welton to North Bentwater, the release said. The inside lane will be closed.

Electronic message boards are up. Traffic control devices will be put up and taken down daily. The project is scheduled for completion in three weeks.

Tangerine Road

Through this Saturday, Sept. 25, between 8 p.m. and 6 a.m., crews are working to complete rubberized chip seal on Tangerine Road between the Union Pacific Railroad and Thornydale Road. The work is the first phase of resurfacing the existing roadway. Pilot vehicles are escorting motorists through the construction zone. Motorists may be required to stop for as long as 30 minutes until escorted. This is a Town of Marana project.

(0) comments

Welcome to the discussion.

Keep it Clean. Please avoid obscene, vulgar, lewd, racist or sexually-oriented language.
PLEASE TURN OFF YOUR CAPS LOCK.
Don't Threaten. Threats of harming another person will not be tolerated.
Be Truthful. Don't knowingly lie about anyone or anything.
Be Nice. No racism, sexism or any sort of -ism that is degrading to another person.
Be Proactive. Use the 'Report' link on each comment to let us know of abusive posts.
Share with Us. We'd love to hear eyewitness accounts, the history behind an article.