The Loop to remain open during concrete pour - Tucson Local Media: News

The Loop to remain open during concrete pour

Print
Font Size:
Default font size
Larger font size

Posted: Wednesday, May 7, 2014 4:00 am

Users of The Loop along Pantano Wash southeast of Michael Perry Park are asked to use caution during a concrete pour that was scheduled to begin on Tuesday, May 6.

The Loop will remain open, but pedestrians and bicyclists will need to be aware of concrete truck traffic on the path. The trucks will be escorted into and out of the site, warning users to move off to the shoulder or to a safe pull-out location during passing traffic.

Pima County Regional Flood Control District is repairing drainage in the area. The work is needed to protect the slope and subgrade sewer lines from off-site storm drainage and is expected to be completed by mid-May.

Please visit The Loop online for the latest maps and updates on access, improvements and other news about The Loop. Or check out – and “like” – The Loop on Facebook.

© 2016 Tucson Local Media. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

More about

More about

Welcome to the discussion.

PGA Tour Superstore Grand Opening

More Featured Videos

Featured Videos

Spacer4px

Online poll

What do you think should happen with Som and Krystin Lisaius' child?

Som and Krystin Lisaius, two members of Tucson’s local media scene, have found themselves in a deeply troubling situation after taking their 4-month-old daughter to a local hospital, where cocaine was found the child’s system.

Total Votes: 189

Loading…
Loading…

Follow us on Facebook